Close Menu
The Prime Times
  • Home
  • NEWS
  • POLITICS
  • BUSINESS
  • EDUCATION
  • OPINION
  • TRAVELS
  • INTERVIEW
  • ENTERTAINMENT

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Truth on Trial: Prof. Isiaka Aliagan Champions Ethical Journalism in the AI Age at Unilorin Lecture

June 19, 2025

United Foam Products Nigeria Ltd. Issues Disclaimer on Missing Person’s Affiliation

June 19, 2025

Former President Obasanjo, Governor Inuwa Yahaya Commission Ultra-Modern Processing Factory in Gombe

June 18, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
The Prime Times
Subscribe
  • Home
  • NEWS
  • POLITICS
  • BUSINESS
  • EDUCATION
  • OPINION
  • TRAVELS
  • INTERVIEW
  • ENTERTAINMENT
The Prime Times
Home»News»Stakeholders canvass retooling of Eligible Customer Policy as 9,000MW power remains stranded
News

Stakeholders canvass retooling of Eligible Customer Policy as 9,000MW power remains stranded

admin@theprimetimesBy admin@theprimetimesNovember 2, 2022No Comments5 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email

TCN’s bottlenecks, DisCos load rejection slow generation expansion

Five years after the Federal Government introduced an eligible customer policy to address the dismal state of electricity supply in the country, stakeholders have insisted that the policy remained a mirage amid repeated grid collapse and load rejection.

Considering infrastructure bottlenecks to wheel electricity to consumers, energy stakeholders tasked the Nigerian Electricity Regulatory Commission (NERC) to hasten approval process and strengthen the policy to improve power supply across the country.

The stakeholders are also worried over stranded electricity, as over 9,000 megawatts installed capacity is not evacuated due to transmission and distribution bottlenecks.

Coming at a time that states are looking to venture into independent power generation, they raised the need to leverage the existing stranded 3,000MW available through the Niger Delta Power Holding Company (NDPHC), an intervention company owned by the states and Federal Government.

Although Nigeria has about 13,000MW generation capacity, bottlenecks at the Transmission Company of Nigeria (TCN) meant it could only dispatch about 4,000MW, leaving out over 9,000MW. The development is coming amid load rejection by some distribution companies (DisCos) due to infrastructural loopholes.

The Eligible Customer regulation introduced in 2017 permits electricity generation companies (GenCos) and Independent Power Producers (IPPs) to by-pass the Nigerian Bulk Electricity Trading Plc (NBET)) and DisCos to sell electricity directly to classified consumers.

Expectations were that the plan would facilitate competition in supply of electricity, promote rapid expansion of generation capacity, as well as create opportunity for improvement in quality of supply. It was also thought that it would encourage third party access to transmission and distribution infrastructure as a precursor to full retail competition in the Nigerian electricity market, allow licensed GenCos with un-contracted capacity to access un-served and underserved customers, thus improving the financial liquidity of the electricity industry. Sadly, the projected gains have remained dismal.

While government had spent billions of naira in developing National Integrated Power Project (NIPP) to stabilise the electricity supply system, just as the private-sector-led structure of the Electric Power Sector Reform Act (EPSRA) of 2005 took effect, the inability to dispatch power generated, according to stakeholders, remained worrisome and counter-productive.

Decrying the level of waste amid power supply gaps across the country, the stakeholders noted that there was need to fast-track approval to enable NIPP connect electricity directly to stimulate the nation’s economy.

At a time when the country is borrowing to finance projects, the industry experts said deploying capacity would take shorter time to supply electricity than building new plants, while government would be able to deploy scarce resources to other productive areas.

Energy stakeholder, Adetayo Adegbemle, noted that the Eligible Customers policy, like the DisCos franchising regulation, is a brilliant policy that could have helped GenCos recoup some money, but has been bungled by politics.

“There have been reports that customers who got on the policy have been forced to revert when the DisCos kicked,” Adegbemle said.

He stated that the expansion of generation capacity may not be the critical issue in the sector but the fact that some DisCos were not taking up available load.

Adegbemle said: “Electricity is an instantaneous product that must be evacuated and utilised on production. So, if TCN and DisCos that are supposed to evacuate and distribute do not, there’s little GenCos can do.”

Adegbemle stated that there was an urgent need to ensure that NDPHC becomes commercially viable, even if that would include taking a careful look at sub-franchising of DisCos.

“It is only then that more power generation, either by the states, or existing IPPs, will make commercial sense,” he noted.

Partner, Energy Utilities and Resources, PwC, Habeeb Jaiyeola, stated that all efforts have to be made to ensure the currently installed and available capacity of GenCos are fully operational and dispatched. Calling for adequate transmission infrastructure, he said the Eligible Customer policy has been a positive one since its introduction.

“This has led to direct negotiation between groups of consumers with GenCos, DisCos or both, to secure constant reliable electricity at a premium,” he said.

Stressing that an application that involves the DisCo, GenCo and TCN might be most sustainable for the Eligible Customer policy, he said additional infrastructure development and urgent need for investment in infrastructure of the DisCos must also become a priority to increase power supply to consumers.

Managing Director of Mainstream Energy, Lamu Audu, told The Guardian that government needs to liberalise and allow generation companies to sell power directly because eligible customers pay on time and pay 100 per cent.

Audu said the initiative remained the only leeway to addressing the growing liquidity crisis that bedevil the sector.

“That’s how the market should be. The Power Purchase Agreements (PPAs) are backed by bank guarantee but we have paused the bank guarantee, otherwise, if you don’t pay me, I will move to the bank. If we free the market, liquidity crisis will disappear,” he said.

Energy professor at the University of Lagos, Yemi Oke, said the policy has suffered regulatory and policy inconsistency due to DisCos’ kick back.

Calling for the policy to be repackaged and placed above the frustration and lobby by DisCos to halt its operation, Oke said loopholes in the policy are forcing high-end customers to focus on captive generation.

According to him, weak distribution and transmission infrastructure would continue to frustrate efforts of NDPHC, as the 3,000MW may remain stranded unless something is urgently done.

Source: Guardian.ng

Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleOver 600,000 farmers, others benefit from DDI’s poverty alleviation project
Next Article ‘Network quality in Nigeria, S’Africa better than UK, U.S., others’
admin@theprimetimes
  • Website

Related Posts

Truth on Trial: Prof. Isiaka Aliagan Champions Ethical Journalism in the AI Age at Unilorin Lecture

June 19, 2025

United Foam Products Nigeria Ltd. Issues Disclaimer on Missing Person’s Affiliation

June 19, 2025

Don’t Blame Tinubu – Babalola Says Nigeria’s Woes Began Before 1999

June 18, 2025

Parliament is the Soul of Democracy — Saraki Hails 26 Years of Nigeria’s Democratic Journey

June 17, 2025
Leave A Reply Cancel Reply

Recent Posts
  • Truth on Trial: Prof. Isiaka Aliagan Champions Ethical Journalism in the AI Age at Unilorin Lecture June 19, 2025
  • United Foam Products Nigeria Ltd. Issues Disclaimer on Missing Person’s Affiliation June 19, 2025
  • Former President Obasanjo, Governor Inuwa Yahaya Commission Ultra-Modern Processing Factory in Gombe June 18, 2025
  • Don’t Blame Tinubu – Babalola Says Nigeria’s Woes Began Before 1999 June 18, 2025
  • Parliament is the Soul of Democracy — Saraki Hails 26 Years of Nigeria’s Democratic Journey June 17, 2025
Our Picks

October 18th: World Inherited Blood Disorders Day – GANSID

October 17, 2024

Ajia Congratulates Newly Appointed Ilorin Emirate Traditional Leaders

August 25, 2024

May Day: Tinubu Pledges Better Living Conditions, Salutes Nigerian Workers

May 1, 2024

Hajia Fatimata Aliagan: Celebrating An Iconic Woman of Virtues @ 50th

February 18, 2024
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Don't Miss
News

Gunmen on the rampage in Southeast, kill three policemen, torch INEC office, disperse political meeting

By admin@theprimetimesSeptember 20, 20210

• Police intensify efforts to arrest suspected killers of policemen in Onitsha• Courts shut down…

Doctors insist on strike as court refuses FG’s request

August 24, 2021

ISFF Immortalizes Late Capt. Hosa Okunbor, Raymond Dokpesi, Esama of Benin, Chief Igbinedion Others

October 10, 2023

2023: Appraising Southwest APC leaders’ meeting with presidential aspirants

May 12, 2022

Subscribe to Updates

Get the latest creative news from The Prime Times.

About Us
About Us

The Prime Times, to be known and called The Prime is founded in the year 2020 and it is being published by Nigeria ArtsDaily Media and Publishing Company Limited

Continue>>>

Editor's Picks

October 18th: World Inherited Blood Disorders Day – GANSID

October 17, 2024

Ajia Congratulates Newly Appointed Ilorin Emirate Traditional Leaders

August 25, 2024

May Day: Tinubu Pledges Better Living Conditions, Salutes Nigerian Workers

May 1, 2024
New Comments
  • https://ukrain-Forum.biz.ua on FG Organises Special Lecture, Juma’at Prayer In Commemoration of June 12, Democracy Day
  • James Luka on Where Is Nigeria’s Tourist Industry – Especially Targeting Diaspora?
  • Prime Times on Saraki Made Everyone Who Worked with Him Better than He Met Them – Hon. Moshood Bakare
  • Ayo Abdul oganija on Saraki Made Everyone Who Worked with Him Better than He Met Them – Hon. Moshood Bakare
Facebook X (Twitter) Instagram Pinterest
  • About
  • Contact
  • Advertise
© 2025 The Prime Times. Designed by Chancerbyte.

Type above and press Enter to search. Press Esc to cancel.